Sign In | Join Free | My himfr.com
Home > Assembly Parts >

Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System

    Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers
     
    Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers
    • Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers
    • Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers
    • Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers
    • Buy cheap Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System from wholesalers

    Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System

    Ask Lasest Price
    Brand Name : JH
    Model Number : Pipe clamp with rubber
    Certification : SGS, ISO 9001, CE
    Price : negotiable
    Payment Terms : L/C, T/T
    Supply Ability : 5000 PCS/Day
    Delivery Time : 30-35 days
    • Product Details
    • Company Profile

    Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System


    Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System


    Product profile


    The material used to manufacture our ventilation pipe clamps with rubber is galvanized steel

    DX 51 D+Z80, DX 51 D+Z275, with PVC rubber. It comes in sizes from 80mm to 1250mm. The

    width is 20 mm for Dia 80 – 400 mm and 25 mm above Dia 400 mm and the thickness is 1.8 mm

    under Dia 400 mm and 2.5mm above Dia 400 mm. Our ventilation pipe clamps with rubber also

    have a quick locking system on one side from 80 to 400mm. The locking screw is M6x20mm from

    80-400mm, and M10x25mm from 450-1250mm. Last but not least, the Hex nut is M8/M10 for

    80-400mm, but also available for 450-1250mm upon request. The Maximum suspended weight

    for 800kg is from 80 to 400mm, and for 1000kg from 450 to 1250mm (if there is a hex nut – upon

    request).


    Pipe clamps are two-piece circular pipe clamps fastened together with a pair of steel bolts.

    They are used for suspending the spiral duct in the ventilation system.


    Item codeD (mm)Width x Thickness (mm)Hex connection nut
    PCWR 0808020x1.8M8/M10
    PCWR 0909020x1.8M8/M10
    PCWR 10010020x1.8M8/M10
    PCWR 11011020x1.8M8/M10
    PCWR 12511220x1.8M8/M10
    PCWR 14014020x1.8M8/M10
    PCWR 1505020x1.8M8/M10
    PCWR 16016020x1.8M8/M10
    PCWR 18018020x1.8M8/M10
    PCWR 20020020x1.8M8/M10
    PCWR 22522520x1.8M8/M10
    PCWR 25025020x1.8M8/M10
    PCWR 28028020x1.8M8/M10
    PCWR 30030020x1.8M8/M10
    PCWR 31531520x1.8M8/M10
    PCWR 35535520x1.8M8/M10
    PCWR 40040020x1.8M8/M10
    PCWR 45045025x2.5Optional
    PCWR 50050025x2.5Optional
    PCWR 56056025x2.5Optional
    PCWR 60060025x2.5Optional
    PCWR 63063025x2.5Optional
    PCWR 71071025x2.5Optional
    PCWR 80080025x2.5Optional
    PCWR 90090025x2.5Optional
    PCWR 1000100025x2.5Optional
    PCWR 1120112025x2.5Optional
    PCWR 1250125025x2.5Optional

    Similar Items



    Company information


    We established in 1997, we are one of the largest manufacturers of metal stamping and plastic molding

    injection parts in China, we are close to the ocean ports of Ningbo and Shanghai. JH's specialty is made

    to order (MTO) parts based on customer drawings or samples, more than 95% of our products are

    exported the whole Europe countries, we have in house tool making which allows us to offer low cost

    and fast tooling. meanwhile, we could supply the second operation with our customers like riveting,

    tapping, electrolating, welding, assembly, powder coating..., we have robtic welder, powder coating and

    assembly line in house.


    FAQ


    Q: What is the payment method?
    A: We accept TT (Bank Transfer), L/C.
    1. For total amount under US$3000, 100% in advance.
    2. For total amount above US$3000, 30% in advance, the rest against the copy document.

    Q: What is your MOQ?
    A: MOQ depends on our client's needs, besides,we welcome trial order before mass-production.

    Q: What is the production cycle?
    A: It varies a lot depending on product dimension,technical requirements and quantity. We always

    try to meet customers' requirement by adjusting our workshop schedule. Usually our normal lead

    time is 25-30 days for 1 full container; it is also up to the actual production situation and products

    structure.


    Q: If you make poor quality goods,will you refund our fund?
    A: We make products according to drawings or samples strictly until them reach your 100%

    satisfaction.And actually we won't take a chance to do poor quality products.We are proud of

    keeping the spirit of good quality.

    Q: Could you offer competitive tooling cost?
    A: We have own mold work-shop in our factory, for competitive tooling cost and on-time

    samples.


    Product Tags:

    pipe clamps

      

    stamping components

      
    Quality Pipe Clamps Rubber For Suspending Spiral Duct In Ventilation System for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Yuyao Jingqiao Hardware Factory
    *Subject:
    *Message:
    Characters Remaining: (0/3000)